For HT Side


This service is for 11/.4 KV for our 11KV clients.

1 . Load Break Switch (Optional)                                                                             

2.Fuses and Lighting Arresters with Fittings                                                                                          

3. HV Cables with Lugs and Dressing materials.     

4. HT Switch Gear

5. Transformer                                                                                                                                                                         

LT Side

  1. Main Circuit Breaker.

  2. LV Distribution Panel .

  3. LV Circuit Breakers.

                                       For your correct estimation please fill up the form and send it to us

Blank Form (#14)
You may place your option about country of origin and country of manufacture for any equipment of your substations.